Production process of Ductile Iron Pipes
Manufacturing process of ductile iron pipe: 1. Molten Iron Preparation. 2. Spheroidization 3. Core Making. 4.Centrifugal Casting
Manufacturing process of ductile iron pipe: 1. Molten Iron Preparation. 2. Spheroidization 3. Core Making. 4.Centrifugal Casting
Stainless steel Blind flanges; Flange Standard: ANSI B16.5; Flange material: Stainless steel ASTM A182 F304/F316/F321 Other material: steel flanges ASTM A105;
Stainless steel slip on flanges; Flange Standard: ANSI B16.5; Flange material: Stainless steel ASTM A182 F304/F316/F321 Other material: steel flanges
Forged Pipe Fittings, High Pressure Pipe Fittings. NPT threaded type or Butt-welding type or Socket welding type. Forged Stainless Outlets
DIN 3352 F4 Gate Valves, Rising Stem Resilient Soft Seated Grate Valves Cast Iron Valves Working Pressure: PN10/PN16 Flange drilled
High Pressure Pipe Fittings Forged Pipe Fittings. Forged Fittings Type: Forged Hexagon Nipple. Forged Fittings Material: Carbon steel to ASTM
Based on MSS SP-6-2007 standard, we design and machine the ASTM flange contact finishes for steel flange of ANSI B6.5. Stock
High Pressure Pipe Fittings Forged Pipe Fittings. Forged Fittings Type: Forged Steel Union. Forged Fittings Material: Carbon steel to ASTM